Net-zero Energy Targeted Beverly Police Station in Construction

February 24, 2021:  Currently in construction, the 33,000 SF new police station for the City of Beverly, MA is targeted for net-zero energy. As the MEP/FP engineer for this project, AWE has been collaborating with the Foxborough MA based architectural firm Kaestle Boos Associates and has designed a geothermal space cooling / heating and domestic hot water heating system for the building.

BeverlyPD

Leave a comment.

Your email address will not be published. Required fields are marked *

CAPTCHA Image

*

2021 © Air Water Energy Engineers, Inc.